LoRaWAN
LoRa Alliance
The official technical basis for the LoRaWAN standard. The device, coverage and measurement interval are verified under deployment conditions.
How we distinguish source information, verified conditions and proposed next steps in asset management, energy and IoT.
For each requirement, we identify the site or location, the question to be answered and the expected result. An existing list, a measurement and a historical document do not provide the same level of evidence.
A measurement retains its source, time and unit; a document retains its relationship to the site and period. Missing or unverified data should remain identifiable. An import is not a physical inspection, and the last received value is not automatically the current status.
A pilot specifies what needs to be demonstrated: correct device assignment, usable data, communication availability or connected workflows. The outcome is assessed against the agreed goal. Consumption comparisons also take account of operating conditions and data quality.
The following links explain technologies and the legal framework. They are not presented as evidence of SmartGovIOT certification, partnership, achieved savings or completed deployment.
LoRa Alliance
The official technical basis for the LoRaWAN standard. The device, coverage and measurement interval are verified under deployment conditions.
SEPS – materská spoločnosť OKTE / OKTE parent company
Primary information from the operator’s group about EDC. It does not mean that every data channel is already connected to SmartGovIOT; access and integration require separate verification.
EUR-Lex
The EU personal-data protection framework. The conditions of a particular processing activity depend on its purpose and the roles of the parties involved.
Úrad na ochranu osobných údajov SR
Official guidance on data-subject rights. Information on processing by this website is provided separately in its Privacy notice.
Content responsibility: KNH INVEST s. r. o. Check the currently effective source and the agreed deployment documentation before applying a requirement.