Methodology and sources

Purpose before data

For each requirement, we identify the site or location, the question to be answered and the expected result. An existing list, a measurement and a historical document do not provide the same level of evidence.

Source, time, unit and quality

A measurement retains its source, time and unit; a document retains its relationship to the site and period. Missing or unverified data should remain identifiable. An import is not a physical inspection, and the last received value is not automatically the current status.

Verification of a specific scope

A pilot specifies what needs to be demonstrated: correct device assignment, usable data, communication availability or connected workflows. The outcome is assessed against the agreed goal. Consumption comparisons also take account of operating conditions and data quality.

Primary sources

The following links explain technologies and the legal framework. They are not presented as evidence of SmartGovIOT certification, partnership, achieved savings or completed deployment.

LoRaWAN

LoRa Alliance

The official technical basis for the LoRaWAN standard. The device, coverage and measurement interval are verified under deployment conditions.

Energetické dátové centrum / EDC

SEPS – materská spoločnosť OKTE / OKTE parent company

Primary information from the operator’s group about EDC. It does not mean that every data channel is already connected to SmartGovIOT; access and integration require separate verification.

GDPR

EUR-Lex

The EU personal-data protection framework. The conditions of a particular processing activity depend on its purpose and the roles of the parties involved.

Content responsibility: KNH INVEST s. r. o. Check the currently effective source and the agreed deployment documentation before applying a requirement.